The council has named six areas on the edge of Warrington where new homes could go, from south of Birchwood station to west of Stretton. Comments close on 11 January.

Warrington Borough Council has named six “areas of search” on the edge of the town where new homes could be built. They include land south of Birchwood station, land west of Stretton and land east of the South East Warrington Urban Extension.

The areas are shown on maps in the council’s Plan Content and Evidence Consultation document, published when the Local Plan consultation opened on Tuesday 17 November. Comments close at 5pm on Monday 11 January 2027.

The council stresses that these are not chosen sites. Its consultation page says: “we are not showing preferred locations or preferred sites at this stage”. The areas were drawn around land that developers put forward in the call for sites.

Overview

  • What is open: the second consultation on Warrington’s new Local Plan, from 17 November 2026 to 5pm on 11 January 2027.
  • What is new: maps of six areas on the edge of the town where about 1,850 homes could go, and seven possible locations for new jobs land.
  • What is not decided: any individual site. Draft site allocations come in a full draft plan, which the council expects to consult on in autumn or winter 2027.
  • How to respond: the council’s online survey, by email to localplan@warrington.gov.uk, by post, or at one of five drop-in events.

The six areas on the edge of town

The plan needs about 13,250 homes over its period, including a 15% contingency. About 9,500 can come from land already identified. Of the rest, about 1,850 would go on the edge of the main urban area and about 1,850 in the outlying villages.

For the edge of town, the council has two joint preferred options. One is a single urban extension in one of the areas below, topped up with smaller sites. The other is a number of smaller Green Belt sites spread across several areas. The document says more work is needed to show whether any one area could take an urban extension and deliver it within the plan period.

Its assessment of each area, from the summary maps in Appendix 2:

Area of search In its favour Problems the council lists
South of Birchwood station Next to the station; could take higher density; no major heritage or landscape issues; a larger scheme could include a primary school and health facility Loss of strongly performing Green Belt; underlying peat and minerals; possible water supply and secondary school capacity issues
West of Stretton Smaller schemes could use the road network and the urban extension’s schools and health services Road concerns for larger growth without another Ship Canal crossing; utilities and public transport upgrades needed; risk of merging Stretton into Hatton
East of the South East Warrington Urban Extension Could link into the urban extension’s schools and health services; some grey belt land “Significant conflict” with the urban extension’s framework; road concerns; risk to the character of Grappenhall village and Appleton Thorn
South west of Warrington Some grey belt land; a larger scheme could include a new primary school “Significant highways concerns”; possible impact on the Walton and Moore conservation areas; Green Belt between Warrington and Runcorn; part of the area at flood risk
West of Warrington Infrastructure could take smaller growth; some grey belt land Road and school capacity for larger growth; Green Belt between Warrington and Widnes; within a critical drainage area
South west of Bank Quay Gateway Could extend the Bank Quay regeneration area Road, rail and other infrastructure needs make delivery “highly unlikely” in the plan period

Bank Quay Gateway itself, the regeneration area around a possible Northern Powerhouse Rail station, could take about 4,500 homes. It is not counted in the supply because the funding and timing of its infrastructure are uncertain.

The villages

The preferred option for the villages is “incremental growth” of roughly 100 to 400 homes each. The council assessed Lymm, Culcheth, Burtonwood, Croft, Winwick, Glazebury, Glazebrook, Hollins Green and Appleton Thorn.

Some of the constraints it lists:

  • Lymm: traffic constraints in the village centre; a larger scheme would need another primary school and could affect the Green Belt between Warrington and Lymm.
  • Culcheth: a larger scheme raises primary and secondary school capacity issues.
  • Croft: a lack of community healthcare.
  • Appleton Thorn: limited primary school places and a risk of merging into the urban extension.
  • Glazebrook: no primary school, and a better train service would be needed.

We reported the village figures from the council’s options tables earlier this month.

Land for jobs

The plan needs about 237 hectares of employment land. About 113 hectares is already available, most of it at Fiddlers Ferry. The council proposes at least one more large site for industry and logistics, plus smaller local sites.

The document maps seven possible locations:

Location Land put forward
South East Warrington up to 200 hectares
South of Birchwood up to 179 hectares, about 95 developable because of peat and minerals
North of Omega up to 80 hectares
M6 junction 22 up to 52 hectares
Port Warrington up to 13 hectares
Taylor Business Park up to 5.3 hectares
South of Townsfield Lane, Winwick 1.7 hectares

None of these is a preferred site either.

What came before

The council received 360 responses to its scoping consultation earlier this year. Of those, 290 came from residents and 19 from developers. Landowners and developers submitted 118 sites in the call for sites, which ran from 16 April to 1 June 2026. Those figures are from the consultation page’s questions and answers.

Drop-in events

Council officers will explain the plan and help people respond at:

Venue Date Time
Birchwood Leisure Centre Tuesday 24 November 2pm to 8pm
Great Sankey Hub Thursday 26 November 2pm to 8pm
Warrington Central Library Saturday 28 November 10am to 2pm
St Thomas’s Church Hall, Stockton Heath Monday 30 November 2pm to 8pm
Orford Jubilee Hub Wednesday 2 December 2pm to 8pm

Paper copies are at the council’s 1 Time Square reception and in Warrington libraries, according to the council’s formal notice.

What it means for you

  • If you live near one of the six areas, this is the first time the council has put them on a map. The consultation asks directly for comments on each option (question 13 for housing, question 14 for jobs land).
  • Respond by 5pm on 11 January 2027. The council says the online survey is the best way. You can also email localplan@warrington.gov.uk or write to Planning Policy and Programmes, East Annexe, Town Hall, Sankey Street, Warrington WA1 1UH.
  • Sites come later. A full draft plan with proposed sites is due for consultation in autumn or winter 2027.
  • Questions: the Planning Policy and Programmes team is on 01925 442826.

Cllr John Kerr-Brown, the council’s cabinet member for environment, housing and public protection, said in the council’s announcement: “By sharing your views now, you can help influence how we plan for future housing, jobs, infrastructure and community facilities across the borough.”

Sources