The council's preferred option needs about 3,700 homes beyond sites already identified, half in villages such as Lymm and Culcheth. Consultation is open until 5pm on 11 January.
Warrington Borough Council wants its new Local Plan to provide 1,073 homes a year. That is the government’s figure for the borough, and about 30% more than the 870 a year in the plan adopted in 2023.
The council has published its preferred options ahead of a public consultation. Its Local Plan timetable said that consultation would run from 17 November 2026 to 4 January 2027.
Updated 18 November: the consultation opened on 17 November and closes at 5pm on 11 January 2027. The council has now published maps of six areas on the edge of the town where homes could go; we set them out here. Respond through the council’s online survey.
Updated 11 November: Cabinet approved the consultation on Monday 9 November, and the council now says it will run from 17 November 2026 to 11 January 2027, a week longer than its timetable showed. Five drop-in events are listed below. (Warrington Borough Council)
The council accepts that hitting the figure means releasing some more Green Belt land.
The numbers
The council’s Initial Options and Assessment Tables set out the preferred approach for housing:
- About 13,250 homes are needed over the plan period, including a 15% contingency.
- About 9,500 can come from land already identified, such as sites with planning permission and existing allocations.
- Around 1,850 more would go on the edge of the main urban area. That could be one urban extension, a number of smaller Green Belt sites, or both.
- Around 1,850 more would come from “incremental growth” in the outlying villages.
- Bank Quay Gateway, the town centre regeneration area around a possible Northern Powerhouse Rail station, is a long-term priority but is not counted in the supply.
The plan would run for 10 years after adoption, from 2028/29 to 2038/39. The council chose this over a 15-year plan partly because it “reduces the risk of premature Green Belt release”. Adoption is pencilled in for March 2029.
What it means for the villages
The council assessed two scenarios for each outlying settlement. Its preferred option is the smaller one: growth of roughly 100 to 400 homes per village, in proportion to its size.
The larger option was a settlement extension of 1,400 homes for Lymm or Culcheth, the two biggest villages and the only ones with secondary schools, and 700 homes for the others. The council does not prefer it. Its reasons include “greater impact on character and landscape” and greater demands on roads, schools and green space in the village that grows.
It also rejected the opposite approach of putting all new homes next to the town and none in the villages. It said that would strain secondary schools in the urban area and could leave village shops and services unviable.
The settlement figures in the council’s table add up to 1,800. The strategy rounds this to “around 1,850”.
No sites have been chosen yet. The council says this stage “does not confirm preferred locations for development, specific numbers of homes for the settlements, or any specific sites”. Developers and landowners put forward 118 sites (the council’s earlier page said 119) in the call for sites earlier this year, according to the council’s Local Plan page.
Jobs land
For employment, the preferred option needs about 237 hectares, including a two-year contingency. About 113 hectares is already available. The rest would come from at least one new strategic site plus smaller local sites. One paragraph of the document gives the requirement as 273 hectares; its own table and spatial strategy both say 237.
Why not fewer homes?
The council considered sticking with 870 a year. It rejected that because it would not meet the borough’s need for affordable and specialist housing. It also said no neighbouring council has offered to take any of Warrington’s housing need.
It warns that a lower target risks the plan failing its independent checks, “exposing the Borough to more unplanned development”. Without an up-to-date plan, developers can win permission on appeal for sites the council has not chosen.
The figures include Thelwall Heys, near Grappenhall, which was added to the supply after the government lifted a holding direction on it in October.
What happens next
| Stage | Date |
|---|---|
| Consultation on plan content and evidence | 17 Nov 2026 to 11 Jan 2027 |
| Government assessor’s advice (Gateway 2) | June 2027 |
| Consultation on the proposed plan | 19 Oct to 14 Dec 2027 |
| Submission for examination | July 2028 |
| Council considers adoption | March 2029 |
Dates are from the council’s September 2026 timetable and can change. The first consultation date is from the council’s 11 November announcement, which also says that consultation on individual sites will follow in autumn 2027.
Drop-in events
The council is holding these drop-in events:
| Venue | Date | Time |
|---|---|---|
| Birchwood Community Hub (Leisure Centre) | Tuesday 24 November | 2pm to 8pm |
| Great Sankey Neighbourhood Hub | Thursday 26 November | 2pm to 8pm |
| Warrington Central Library | Saturday 28 November | 10am to 2pm |
| St Thomas’s Church Hall, Stockton Heath | Monday 30 November | 2pm to 8pm |
| Orford Jubilee Hub | Wednesday 2 December | 2pm to 8pm |
You can also respond online or in writing.
What it means for you
- Have your say from 17 November to 11 January. This is the stage where the council asks how much growth there should be and roughly where it should go. Specific sites come later.
- If you live in Lymm, Culcheth or Burtonwood, the scale proposed for your village is in the chart above. The 1,400-home extension options are not the council’s choice, but they were assessed and will be in the consultation papers.
- Read the evidence now. The Green Belt assessment, housing need assessment and the updated housing land availability assessment are all on the council’s Local Plan page.
- Follow planning in your area on our Warrington planning news page.
Sources
- Warrington Borough Council, Local Plan Initial Options and Assessment Tables, November 2026: Table 1, Table 2 and section 5.
- Warrington Borough Council, Warrington Local Plan Timetable, September 2026, Table 1.
- Warrington Borough Council, Updating Warrington’s Local Plan, read 5 November 2026, for the call for sites total and the evidence documents.
Have your say